Laserfiche WebLink
S�gNT OF Ty ��ENTOF j <br /> U. S. DEPT. OF THE INTERIOR <br /> V0 OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o <br /> Mine-Site Evaluation Inspection ReportF� <br /> �4RCH 3 �s <br /> 10. Type <br /> 1. Permittee/Person 9. Permit Number a.Permit b.RA <br /> MID-CONTINENT RESOURCES 1 C-81-017 I NP RS <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> PO BOX 1298 07/07/93 CC �Y YIN <br /> MM - DD - YY <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> GLENWOOD SPR. CO BF FP 1 <br /> 5. Zip Code 6. Phone Number 17. OSM Office# 18. RSI# 19. Land Code <br /> 81602 -� 020 FS <br /> 7. Operator if Different than Permittee 20. M.S.H.A.ID# 21. State Code 22. County Code <br /> PITKIN IRON CO OS-00469 08 097 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number <br /> COAL BASIN 091955 <br /> 24. Performance Standard Categories <br /> Codes: 1=Com liance 2=Noncom liance 3=Not Plana 4=Not S =Noncom licence Identified Elsewhere <br /> A. Administrative D. Backfilling&Grading H.-Subsidence Control Plan <br /> I.-Mining within Valid Permit I.-Exposed Openings I. Roads <br /> 2.-Mining within Bonded Area 2.-Contemporaneous Reclamation 1. Road Construction <br /> 3._Terms&Conditions of Permit 3._Approximate Original Contour 2.-Certification <br /> 4.-Liability Insurance 4._Highwall Elimination 3, 2 Drainage <br /> 5.-Ownership and Control 5.-Steep Slopes(includes downslope) 4._-Surfacing and Maintenance <br /> 6._Temporary Cessation 6._Handhng of Acid&Toxic Materials 5. Reclamation <br /> B. Hydrologic Balance 7._Stabilization(rills and gullies) <br /> 1. 2 Drainage Control E. Excess Spoil Disposal J. Signs&Markers <br /> 2.-Inspections&Certifications I.-Placement I.-Signs <br /> 3._Siltation Structures 2.-Drainage Control 2.-Markers <br /> 4._Discharge Structures 3._Surface Stabilization K. Distance Prohibitions <br /> 5. 2 Diversions 4.-Inspections&Certifications - <br /> 6._Effluent Limits L. Revegetation <br /> 7._Ground Water Monitoring F. Coal Mine Waste I.-Vegetative Cover <br /> 8._Surface Water Monitoring (Refuse Piles/Impoundments) 2.-Timing <br /> 9._Drainage--Acid-Toxic Materials 1. 2 Drainage Control <br /> 10._Impoundments 2.-Surface Stabilization M.-Postmining Land Use <br /> 1 I.-Stream Buffer Zones 3._Placement <br /> 4._Inspections and Certifications N. Other <br /> C. Topsoil&Subsoil 5._Impounding Structures <br /> I.-Removal G. Use Of Explosives ?1) DEPRESSIONS <br /> 2._Substitute Materials I.-Blaster Certification <br /> 3._Storage and Protection 2.-Distance Prohibitions -2) <br /> 4. Redistribution 3._Blast Survey/Schedule 3 <br /> 4.-Warnings&Records - ) <br /> 5. Control of Adverse Effects <br /> 25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br /> a.Date of Last a.Total <br /> State Complete <br /> Inspection a 03/30/93 2.0 .Permit Review 333.0 bonded <br /> 0.0 a.Permitted <br /> Frequency for previous 4 Calendar Qtrs. b.Phase I <br /> b.Number of Number of 4.5 b.Inspection Time 0.0 released <br /> required complete 33.' b.Disturbed <br /> complete 4❑ inspections 3❑ c.Phase II (Estimated) <br /> inspections conducted <br /> 5.0 c.Travel Time 0.0 released <br /> c Number of Number of <br /> required partial d.Phase III <br /> partial � inspections 5.0 d.R rt Writin 0.0 released Page 1 of- <br /> inspections conducted epo S <br />