My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (137)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (137)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:26:59 AM
Creation date
10/17/2012 11:26:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. DEPARTMENT OF THE INTERIOR NOV Number <br /> 'Office of Surface Mining Reclamation and Enforcement 93 — 020 — 250 —00 <br /> Violation Number <br /> NOTICE OF VIOLATION (CONTINUATION) 1 of 1 <br /> NATURE OF PERMIT CONDITION VIOLATED, PRACTICE OR VIOLATION <br /> Failure to properly divert drainage from a coal mine waste bank <br /> PROVISION(S) OF THE REGULATIONS, ACT OR PERMIT VIOLATED <br /> 4.10.3 2 4.09.2 7 <br /> PORTION OF THE OPERATION TO WHICH NOTICE APPLIES <br /> The southwestern most end of the old refuse pile adjacent to Dutch Creek <br /> t <br /> CORRECTIVE ACTION REQUIRED (Including Interim Steps, if Any) <br /> 1. Construct a diversion designed in accordance with the approved Colorado program, <br /> to divert and ensure positive drainage of all surface runoff and seepage from the waste <br /> bank to the approved sedimentation pond. <br /> 2. Submit as-built designs, certified by a registered professional engineer, to the <br /> OSM-Albuquerque Field Office. _ DOI-Office of Surface Mining__ <br /> 505 Marquette Ave. N.W. Suite 1200 <br /> Albuquerque, NM 87102 <br /> TIME FOR ABATEMENT (Including Time for Interim Steps, if Any) <br /> 1. Conduct all work in a safe and workmanlike mannpr to he completed no later than <br /> three (3) calendar days after receipt of this NQV- <br /> 2. As-built certifications are to be done upon completion of construction. Certified <br /> designs shall be submitted to the Albuquerque Field Office within two (2) days of <br /> completion of construction. <br /> Return Receipt #P 079 748 629 <br /> Copy Distribution White-District Office File, Blue-Permittee,Yellow-Assessment Office, Pink-Field Office,Green-Inspector IE-156A (12/80) <br />
The URL can be used to link to this page
Your browser does not support the video tag.