Laserfiche WebLink
O` Co5TATE OF COLORADO <br /> h� 9b <br /> * w* Roy Romer, Governor <br /> {J876 a <br /> I <br /> DEPARTMENT OF NATURAL RESOURCES <br /> MINED LAND RECLAMATION DIVISION <br /> FRED R. BANTA, Director <br /> DATE: October 24, 1989 <br /> TO: Bill Crick <br /> FROM: Harry Ranney <br /> RE: Mid-Continent MR Bond Amount <br /> Mid-Continent is utilizing outdated information in calculating the cost of <br /> removing buildinas and concrete. <br /> Listed below are my calculations for the removal of the two buildings and the <br /> concrete pad. <br /> Concrete Buildino Removal <br /> 28' x 40.67' x 12' = 13,665 cf x .19/cf = $2,596.37 <br /> Concrete Pad <br /> 16. 67' x 16' = 266.72 sf x 2.95/sf = 786.82 <br /> 16.17' x 16' x 8' = 6.59 cy x 4.32/cy (haul ) = 28.45 <br /> Metal Silo <br /> 13' diam x 20' = 2,655 cf x .14/cf = 371 .65 <br /> Sub Total 3,783.29 <br /> Ena/Profit/Insurance = 25% = 945.82 <br /> Total Bond Increase $4,729.11 <br /> 0658F/scg <br /> 215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel.(303) 866-3567 <br />