Laserfiche WebLink
cut up for scrap (buildings, power lines, <br /> conveyors, bins, track, etc. ) . The concrete <br /> buildings and foundations will then be broken <br /> up and pushed against the mine entry face-up. " <br /> The footers beneath the foundations will remain in the ground, and <br /> will be buried. <br /> Reclamation costs for the No. 1 Portal Area are provided in Vol. <br /> 8, Chapter V, Appendix V-D-1. The unit cost for cement/cinder <br /> block structures is .17 per cu. ft. ; for metal .13 per cu. ft. <br /> Included in the reclamation cost estimate is 25% for administrative <br /> costs to the MLRD. <br /> Our bond calculation TOTALS $3 ,372.55, estimated as follows: <br /> Concrete Building <br /> 28' x 40.67' x 121= 13 ,665 cu. ft. <br /> x .19 = 2596.37 <br /> Concrete Pad <br /> 16.67' x 16' = 266.72 sq. ft. <br /> x 2.95 = 786.82 <br /> Hauling Cost <br /> 6.6 cu. yd. x 4. 32 per cu. yd. = 28.45 <br /> Metal Silo <br /> 3 .14 x 6.52 x 20' = 2655 cu. ft. <br /> x .14 = 371.65 <br /> TOTAL = 3783 . 29 <br /> MLRD Administrative Cost = 25% = 945.82 <br /> TOTAL 4729.11 <br /> Enclosed is a revised map, II-B-4-b indicating the site and <br /> addition to the brieden plant. <br /> Thank you. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources <br /> 2 <br />