Laserfiche WebLink
-4- <br /> 6. Construct a sump to contain oil and grease spillage from the Mine No. 3 <br /> hoist house. <br /> 7. Reconstruct the berm/ditch in the road directing drainage to the south <br /> ponds at Mine No. 3. <br /> 8. Clean the drainage ditch on the north end of the Mine No. 3 bench. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> Item 1 - By June 18, 1984 <br /> Item 2 - By June 04, 1984 <br /> Item 3 - By June 22, 1984 <br /> Item 4 - By June 04, 1984 <br /> Item 5 - By June 04, 1984 <br /> Item 6 - By June 25, 1984 <br /> Item 7 - By June 08, 1984 <br /> Item 8 - By June 11, 1984 <br /> A� <br /> No. 1870 <br />