Laserfiche WebLink
October 2, 2012 C-1981-008/New Horizon Mine MLT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 Page 4 of 11 <br /> <br /> WFC has conducted additional fine-grading of the Bench 1 surface to the east of the final pit. <br />A portion of the large OB1 stockpile has been used in this operation. <br /> The various topsoil and subsoil stockpiles on the Morgan property appear to remain <br />undisturbed; no new redistribution activities have taken place. <br /> Topsoil that had been stockpiled immediately southeast of the intersection of BB Road and <br />2700 Road appears to have been relocated and placed on top of the “Mixed” topsoil on the <br />Morgan property. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution <br />4.06.4: <br /> Windrows of topsoil have been constructed behind the active pit on the WFC parcel, in <br />preparation for future redistribution across that area. <br /> Topsoil stockpiles at the eastern end of the permit area, for use in reclaiming the northwest <br />perimeter haul road and the facilities area, appear to be stable and protected from wind or <br />water erosion. <br /> <br /> <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br /> <br />No enforcement actions were issued as a result of this inspection, and none are pending. <br />