Laserfiche WebLink
October 4, 2012 C-1981-010/Trapper Mine JLE <br /> During this inspection seven test holes were dug to check the depth of the topsoil placed on Parcel K-A-I1. <br /> Enclosed with this report is a map depicting the locations of the test pits. The following is a summaiv of the depth <br /> observed at each of the test holes. <br /> 1.) TP1: 10+inches <br /> 2.) TP2: 12+inches <br /> 3.) TP3: 12+inches <br /> 4.) TP4: 12+inches <br /> 5.) TP5: 12+inches <br /> 6.) TP6: 10+inches <br /> 7.) TPT 10+inches <br /> During this inspection, Trapper was actively hauling topsoil onto the regraded F-Pit area. A team of scrapers was <br /> initially hauling topsoil from Pile F95-2. By the end of the site inspection, Trapper switched to a truck and shovel <br /> team to haul the topsoil to the F-Pit area. <br /> Topsoil stockpile Z2-07 appears to be almost depleted of topsoil. The pile has been graded with gentle slopes and <br /> appears stable. <br /> The Ash 10 stockpile has been spread over the recent backfilled area in the ash pit. <br /> Enclosures: <br /> 1.) Topsoil Test Pit Location Map; October 4, 2011 Inspection Map. <br /> 2.)East Pyeatt Re-Established Drainage Channel Erosion Map; October S, 2011 Inspection Map. <br /> 3.) Weed Patch; Parcel Z-A-08; October S, 2011 Inspection Map. <br /> 4.) 2012 AV,SAnnual Review,Sheet <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 6 of 10 <br />