Laserfiche WebLink
PART I <br />Page No. 10 <br />Permit No. COG-850000 <br />EFFLUENT LA1TfATIONS AND MONITORING REQUIItEMENTS <br />2. Stormwater Manaeement Plan (SWMPI (continued) <br />f) Emolovce Education <br />The pertnittce shall develop and implement employee education programs to inform personnel at all levels of <br />responsibility of the components and goals of the SWMP. Education should address topic such as spill response, <br />good housekeeping and material management practices. The permittce shall identify periodic dazes for such <br />instruction. <br />3. Moaitorine Reauiremen[s <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitations specified in <br />Pan I.B.1, the permittce shall monitor all effluent parameters az the following frequencies. <br />a) Active Minine Outfalls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />TSS, mg/P Monthly Grab <br />Total Iron, mg/P Monthly Gtab <br />Settleable Solids, mP/P Monthly Grab <br />• Oil <br />/ <br />G <br />and <br />rease, mg <br />P Weekly Visual <br />pH, s.u. Weekly In-situ <br />Total Dissolved Solids, mg/P Quazterly Grab <br />CO River Basin ONLY <br />Total Phosphorus (as P), mg/P Quazterly Grab <br />Dillon Reservatr and UUpper Beaz Creek* <br />Drainages Only <br />b) Post-Minine Outfalls <br />Parameter Measurement.Ft~egtrency Sample Type <br />Flow, MGD Monthly Instantaneous <br /> or Continuous <br />Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Monthly Visual <br />pH, s.u. Monthly In-situ <br />Total Dissolved Solids, mg/P Quarterly Grab <br />CO River Basin ONLY <br />Total Phosphoru (as P), mg/P Quarterly Grab <br />• <br />Dillon Reservoir and Upper Beaz Creek* <br />Drainages Only <br />Sce Part I.C. for Definitions <br />