Laserfiche WebLink
PART I <br />Page No. 6 <br />Permit No. COG-850000 <br />EFFLUENT LIIvIITATIONS AND MONITORING REQUf1tEMENTS <br />1. Effluent Limitatioac <br />b. Pos[-Minine Outfalls (continued) <br />POST-MINING ALTERNATE LBKITATIONS <br />Any discharge or increase in the volume of a dischazge caused by pruipitation within any 24-hour period <br />erecter than the 10-veaz. 24-hour orecioitation event (or snowmelt of equivalen[ volume) ~ comply with <br />the following limitations -- subject to burden of proof requiremrnts described in Part 1.B.l.d). <br />Parameter Limitation <br />Flow, MGD Report <br />Settleable Solids, mP/P Report <br />pH, s.u. 6.5-9.0 <br />Oil and Grease, mg/P 10 <br />Total Dissolved Solids, mg/P Report <br />CO River Basin ONLY <br />Total Phosphorus (as P), mg/P Report <br />Dillon Reservoir and 0pper Beaz Creek Drainages ONLY <br />• c. General Limitations -Active and Post-Minine Outfalls <br />1) There shall be no discharge of sanitary wastewaters from taileu or related facilities. <br />2) There shall be no dischazge of floating solids or visible foam in other than [race amounts. <br />3) There shall be no land application of wastewater other than for dust control. <br />4) No chemicals shall be added to the dischazge unless specific approval is granted by the Division <br />d. Burden of Proof Requirements <br />The pertnittce has the bttrdrn of proof when requesting relief from total suspended solids (TSS), total iron <br />and/or settleable solids limitations. Relief shall be granted only when necessary and shall not be granted <br />whrn the permittce has control over the discharge. The permittce should endeavor [o meet the primary <br />limitations whenever possible. The Division shall have final authority in determining whether relief is <br />granted. <br />1) For rainfall, to waive TSS and total iron limitations, it is necessary to demonstrate that dischazge <br />occurred within 48 boon after measurable precipitation has stopped. To waive settleable solids <br />limitations, it is necessary to prove that dischazge occurred within 48 hours after precipitation grearer <br />than the 10-yeaz, 24-hour event has stopped. <br />2) For snowmelt, to waive TSS and total iron limitations, it is necessary to demonstrate that dischazge <br />occurred within 48 hotus after pond inflow has stopped. To waive settleable solids limitations, it is <br />necessary to prove that discharge occurred within 48 hoots after pond inflow volume greater thau the <br />10-yeaz, 24-hoar event has stopped. <br />The Division shall determine the adequacy of proof. As part of this determination, the Division shall <br />• evaluate whether the permittce could have wnrrotled the discharge in such a manner that primary limitations <br />could have been met. All manual dewateriag of ponds that are equipped with automatic dewazermg systems <br />must meet TSS and total iron limitations. If a pond has only manual dewatering capability, relief is <br />available only to the extent required to regain necessary stability and capacity. <br />See Part I.C. for Definitions <br />