My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-11_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2012-10-11_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:22 PM
Creation date
10/12/2012 7:51:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
10/11/2012
Doc Name
Letter & Application
From
Energy Fuels Coal Inc
To
DRMS
Type & Sequence
MR58
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree removal: Given that the referenced spoils pile has existed for an extended time, several trees have <br />grown voluntarily in the spoils pile. These volunteer trees will be removed from the portion of the spoils <br />pile that is to be used for fill material. The larger portions of the trees that are usable will be truck <br />hauled offsite. Options pertaining to the remaining limbs from the tree removal are chipping and <br />spreading of the chips or spreading the limbs on the disturbed areas. <br />The trees that have previously windfell or caved into the subsidence holes will also be removed prior to <br />backfilling and hauled offsite. <br />Mulch: The preapproved rate of mulching in the permit document is 2 tons per acre. Options pertaining <br />to MR -58 are: 2 tons per acre of straw mulch or certified weed free hay or if the remaining tree limbs <br />are chipped, spreading the wood chips on the disturbed areas. <br />Cost estimate: The cost estimate for the above described mitigation plan is $8,350.00. <br />Term of proiect: The contractor is scheduled to prepare the equipment for the project on October 8, <br />2012 and mobilize to the site on October 9, 2012. The contractor anticipates approximately 12 workdays <br />to complete the project. <br />Enclosures: <br />• Revision Application Form <br />• Revised Table 33 Seed Mixture <br />• 8.5" x 11" map from DRMS December, 2011 inspection report <br />• Large map, "Subsidence Mitigation Map" <br />
The URL can be used to link to this page
Your browser does not support the video tag.