Tree removal: Given that the referenced spoils pile has existed for an extended time, several trees have <br />grown voluntarily in the spoils pile. These volunteer trees will be removed from the portion of the spoils <br />pile that is to be used for fill material. The larger portions of the trees that are usable will be truck <br />hauled offsite. Options pertaining to the remaining limbs from the tree removal are chipping and <br />spreading of the chips or spreading the limbs on the disturbed areas. <br />The trees that have previously windfell or caved into the subsidence holes will also be removed prior to <br />backfilling and hauled offsite. <br />Mulch: The preapproved rate of mulching in the permit document is 2 tons per acre. Options pertaining <br />to MR -58 are: 2 tons per acre of straw mulch or certified weed free hay or if the remaining tree limbs <br />are chipped, spreading the wood chips on the disturbed areas. <br />Cost estimate: The cost estimate for the above described mitigation plan is $8,350.00. <br />Term of proiect: The contractor is scheduled to prepare the equipment for the project on October 8, <br />2012 and mobilize to the site on October 9, 2012. The contractor anticipates approximately 12 workdays <br />to complete the project. <br />Enclosures: <br />• Revision Application Form <br />• Revised Table 33 Seed Mixture <br />• 8.5" x 11" map from DRMS December, 2011 inspection report <br />• Large map, "Subsidence Mitigation Map" <br />