Laserfiche WebLink
Average Annual Precipitation and Wind Data <br />as Measured at Summit Point, UT <br />Year <br />Precipitation <br />Wind Velocity <br />Wind Direction <br />Inches <br />mph <br />2011 <br />10.78 <br />2.7 <br />WSW <br />2010 <br />12.36 <br />2.6 <br />SW <br />2009 <br />6.70 <br />5.7 <br />SSW <br />2008 <br />10.78 <br />2.7 <br />WSW <br />2007 <br />8.49 <br />6.2 <br />SSW <br />2006 <br />9.23 <br />4.8 <br />SSW <br />2005 <br />11.93 <br />4.8 <br />S <br />2004 <br />5.71 <br />3.4 <br />S <br />2003 <br />8.23 <br />4.1 <br />SSW <br />Gold Eagle Mining Inc. <br />Hawkeye Mine Permit Number M- 1978 -311 <br />Table 2 <br />This Climate Data was compiled from weather data collected by the Weather <br />Underground and available at their Web site. <br />14.0 Geochemical Data and Analysis <br />Geochemical evaluations of "material that will be exposed by mining, placed in <br />onsite solution containment systems or facilities, stockpiled, or disposed of on <br />the affected land, and that involves uranium mining or has the potential to cause <br />acid mine drainage, or toxic or acid - forming materials" is not available at this <br />time. Such studies cannot be conducted due to the DOE prohibition. Given the <br />extensive nature of the pending DOE PEIS it is expected that general conclusions <br />about the nature of materials and the significance of impacts from ore stockpiles <br />on the DOE properties will become available to append to this plan in the near <br />future. Accordingly, planning (if necessary) for construction of containment <br />facilities will await the outcome of the PEIS work. There are no designated <br />chemicals currently located at the Hawkeye Mine. <br />15.0 Quality Assurance and Quality Control Program for Construction of EPP <br />Facilities <br />As is noted above, there are currently no plans for construction of EPP facilities. <br />16.0 Plant Growth Medium and Soil Characteristics <br />Information pertaining to soil and re- vegetation at the Hawkeye Mine was <br />provided with the 110 Limited Impact Mining and Reclamation Permit Application <br />dated October 2, 1978, and is herein incorporated by reference. The Hawkeye <br />Mine site lies on Soil Map Unit 88 as defined by the Natural Resource <br />Exhibit U -8 <br />