My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-01_REVISION - M1978342
>
Day Forward
>
Revision
>
Minerals
>
M1978342
>
2012-10-01_REVISION - M1978342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:26:52 PM
Creation date
10/10/2012 7:54:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978342
IBM Index Class Name
REVISION
Doc Date
10/1/2012
Doc Name
Ex. U, DMO- EPP
From
Gold Eagle Mining Inc.
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gold Eagle Mining Inc. <br />Ellison Mine Permit Number M- 1978 -342 <br />Ellison Mine permit. Given the current prohibition on activity enacted by the DOE <br />all other permitting and planning has been held in abeyance. <br />Figure 1 Sketch Map of Ellison Mine Site <br />5.0 Designated Chemical(s) Evaluation <br />Chemicals that meet the regulatory definition of Designated Chemical will not be <br />used in the Ellison Mine operations. <br />Exhibit U -2 <br />ELL <br />2 <br />519200N <br />399' 0. <br />.N ........ <br />�-3 <br />519000 9 <br />I t <br />North <br />s <br />0 <br />426 <br />�i <br />E <br />m <br />o , <br />o ' <br />E <br />E LL -4 <br />Union <br />Carbide <br />516,6009 <br />- _ - - ELL -9 E <br />LL <br />5 <br />/! <br />11 <br />11 <br />1 1 1 1 <br />396' Ow <br />P <br />1+A °' <br />H <br />yy <br />318,600 N <br />Union <br />Carbide <br />TANI V <br />PORTAL <br />21 B' Du• South <br />2 <br />518,400N <br />ELL - 7 <br />Union <br />Corbi <br />51e bue Wert <br />ELL <br />30 <br />31 <br />/ <br />29 <br />32 <br />516,200 N <br />Gold Eagle Mining Inc. <br />Ellison Mine Permit Number M- 1978 -342 <br />Ellison Mine permit. Given the current prohibition on activity enacted by the DOE <br />all other permitting and planning has been held in abeyance. <br />Figure 1 Sketch Map of Ellison Mine Site <br />5.0 Designated Chemical(s) Evaluation <br />Chemicals that meet the regulatory definition of Designated Chemical will not be <br />used in the Ellison Mine operations. <br />Exhibit U -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.