Laserfiche WebLink
TR -13 <br />TR -14 <br />TR -15 <br />TR -16 <br />TR -17 <br />TR -18 <br />AR -01 <br />SR -02 <br />5/22/2003 <br />2/12/2004 <br />6/16/2004 <br />3/20/2012 <br />7/24/2012 <br />Current Submittal <br />3/15/1999 <br />7/9/2002 <br />• Haul road construction. <br />• Topsoil salvage change. <br />• Relocate topsoil storage piles. <br />• Tem l ora u bland interce. tion ditch crossin .s. <br />• Barge System as- builts. <br />• Tailin • Pond Hydrolo • y. <br />• Dewatered, high- density Urad sludge disposal in <br />#1 Dam tailin • im . oundment. <br />• Development/implementation of a formal <br />Groundwater Management Plan. <br />• Additional To I soil Stock file Stora_e Location. <br />• Revision and submittal of Environmental <br />Protection Plan. <br />• Acrea_e Reduction Revision. <br />• Increase Financial Warran . <br />Climax Molybdenum Company <br />Henderson Operations <br />