Laserfiche WebLink
Appendix E <br />List of DRMS Technical Revisions <br />Henderson Mine and Mill, Permit M- 1977 -324 <br />October, 2012 <br />TR- Historic <br />aka <br />HR -01 <br />TR- Historic <br />aka <br />HR -02 <br />TR- Historic <br />aka <br />HR -03 <br />TR- Historic <br />aka <br />HR -04 <br />TR -01 <br />TR -02 <br />TR -03 <br />TR -04 <br />TR -05 <br />TR -06 <br />TR -07 <br />TR -08 <br />TR -09 <br />TR -10 <br />TR -11 <br />TR -12 <br />4/13/1979 <br />7/9/1980 <br />3/29/1983 <br />10/26/1983 <br />4/8/1988 <br />3/11/1991 <br />6/28/1991 <br />8/10/1995 <br />10/2/1995 <br />8/29/1996 <br />3/31/1999 <br />6/30/1999 <br />4/11/2000 <br />5/18/2001 <br />9/4/2001 <br />9/6/2002 <br />• Change the timetable for reclamation of Area 10 <br />of Henderson Mine from 1979 to 1983 for 5 acres <br />and 2006 for remaining 6 acres. <br />• Exchange 50 acres of disturbed area from Area 21 <br />for 50 acres northwest of the tailing dam outside <br />of the present affected land boundary. <br />• Exchange 13 acres of disturbed area from the <br />southwest end of Area 23 for 13 acres adjacent to <br />Area 9 outside present affected land boundary. <br />• Clarify statements in permit application that will <br />be considered as commitments. <br />• Institute an alternate form of bonding and <br />establish a reclamation trust fund. <br />• Revised requirement for soil cover on tailing. <br />• Revise the soil stockpile plan. <br />• Proposed soil stockpile plan meeting requirement <br />to cover tailing deposition area with an average <br />12 inch soil depth. <br />• Affected area boundary markers in response to <br />1990 MLRD regulations ammendment. <br />• Environmental Protection Plan. <br />• Groundwater Monitoring Plan. <br />• Establish Points of Compliance. <br />• Establish Numerical Water Quality Limits. <br />• Add possible Henderson water treatment facility <br />for DRMS bonding purposes. <br />• Affected land exchange. <br />• Use of Pond 1.2 for water treatment sludge <br />disposal from (offsite) Urad wastewater treatment <br />plant. <br />• Tailing Pond decant pipe and emergency spillway <br />pipe plugging. <br />• Seepwater collection and pumpback. <br />• 1 -Dam GW Interception Well Field. <br />• Topsoil salvage methods. <br />• Permit revision in response to financial warranty <br />increase. <br />Climax Molybdenum Company <br />Henderson Operations <br />