Laserfiche WebLink
TR -18 to Permit M- 1977 -342 <br />Environmental Protection Plan <br />3. OTHER AGENCY ENVIRONMENTAL PROTECTION MEASURES AND <br />MONITORING <br />3.1. General Information <br />The Henderson Mine and Mill are subject to additional environmental statutes, regulations and <br />permitting requirements including those promulgated by: <br />• Colorado DRMS; <br />• Colorado Department of Public Health and Environment (CDPHE); <br />o Air Pollution Control Division (APCD); <br />o Water Quality Control Division (WQCD); <br />o Hazardous Materials and Waste Management Division (HMWMD); <br />• Colorado State Engineer (dam stability and water rights); <br />• U.S. Environmental Protection Agency (EPA); <br />• U.S. Army Corp of Engineers; and <br />• U.S. Forest Service (related to two parts of the site: area underlying the conveyor system, <br />and the area just above the portal). <br />Permits and authorizations related to environmental protection measures and monitoring are <br />discussed in Section 4.0 below. <br />Climax Molybdenum Company <br />Henderson Operations <br />October, 2012 <br />Page 6 of 40 <br />