My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (193)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (193)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:06:48 AM
Creation date
10/5/2012 9:22:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-12- <br /> f. Remove the tree felled across the emergency spillway of the <br /> bus garage pond plus remove the material pushed into the <br /> emergency spillway. <br /> g. Redefine the drainage ditch along the road to the Mine No. <br /> 2 coal stockpile to insure that all drainage enters the <br /> upper end of the bus garage pond. <br /> h. The embankment of the bathhouse pond must be built-up and <br /> the emergency spillway must be dug out to bring this pond <br /> into compliance with the approved designs. <br /> i . Construct a spill containment structure around the fueling <br /> area on the northwest corner of the Savage shop and repair <br /> leaks in the fueling system. <br /> j. The drainage ditch below the Mine No. 1 coal stockpile must <br /> be cleaned of sediment, the breach in the ditch must be <br /> repaired, and all coal along the edge of the ditch adjacent <br /> to the undisturbed area must be cleaned-up to avoid pushing <br /> this material into the undisturbed area during future <br /> maintenance. <br /> k. Construct a containment structure around the SW gas tank <br /> near Coal Creek. <br /> 1 . Construct a diversion ditch above the Mine No. 1 coal <br /> stockpile area. <br /> m. Revise the permit application to include a contingency plan <br /> for treating runoff to remove suspended solids. This plan <br /> must include a metering system for the addition of any <br /> chemical additives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.