Laserfiche WebLink
-11- <br /> 1 . Failure to follow the approved mine plan. Failure to minimize <br /> disturbance to the hydrologic balance. <br /> 2. Location - The Mine No. 2 bin pad. <br /> E. NOV C-84-085 <br /> 1 . Failure to minimize disturbance to the prevailing hydrologic <br /> balance. Specifically, failure to maintain sediment ponds and <br /> drainage ditches, failure to pass drainage from disturbed areas <br /> through the approved sediment control system, and failure to <br /> properly control oil and grease spills. <br /> 2. Location - <br /> a. Clean sediment from the four ponds in series below the <br /> preparations plant, the savage and (011 ) , and Sediment Pond <br /> 007. <br /> b. Redefine the ditch leading from the outlet of the culvert <br /> over Bear Creek to Sediment Pond 3 at discharge point 001 . <br /> c. Construct a containment structure around the fuel storage <br /> and pumping area directly northwest of the thermal dryer. <br /> d. Construct a drainage control berm from the warehouse pond <br /> (010) to the environmental shed and ensure that all <br /> disturbed drainage flows into the pond as designed. <br /> e. Remove all of the snow and waste piled near Sediment Pond <br /> 010. <br />