Laserfiche WebLink
a <br /> Concerning NOV C-88-02-2 I have sized a 100yr"24hr ditch for <br /> the site. We are in the process of obtaining equipment to <br /> construct this ditch. In order to keep up with placement of <br /> the refuse until the conveyor extension can be built, we <br /> have put two D-8`s on the pile. The details o this plan <br /> will be submitted ender separate cover as required for <br /> abatement of the NOV. <br /> Sincerely, <br /> J <br /> Scott Jones, P.E. <br /> Environmental Engineer <br /> cc. Mr. Ed Mulhall <br />