Laserfiche WebLink
11/"27/79 <br /> Pace 2 of 6 <br /> ASSESSMENT CONFERENCE REPORT <br /> (continued) <br /> 1 . Notice of Violation/Cessation Order No. 79-V-18-3 <br /> Violation 1 of 5 <br /> Use of perennial stream channel as <br /> ( a) Nat:sre of violation a stream ford. <br /> (b) Date of to=,ina-�ion No termination <br /> - Pror�sed Conference <br /> (2) Conference Result Assessment Assessment <br /> (a) His_o-y/Prev. Vio. (30) <br /> (b) Seriousness (30) <br /> ( 1 ) Prchahil.ity <br /> Cccu-rrence ( 15) 14 12 <br /> F-{tent of <br /> Damace ( 15) 8 7 <br /> (2 ) Obstr. to Enforcement ( 15) <br /> ( c) Neglicence (25) 12 8 <br /> ( d) Good Faith (-10) -10 <br /> Total 34 17 <br /> 3. -arrative: <br /> (Brief exalanation of reasons for any changes made in assignment of <br /> points and anv additional information that was presented at the <br /> conference. ) <br /> Probability of Occurence: The ford is situated in an area where the stream bottom <br /> is comprised of rock and gravel. This composition makes it less than likely <br /> that any sediment loading will occur at the crossing. This is especially true <br /> since the crossing was used on one occasion. <br /> Extent of Damage: It is extremely unlikely that any damage that would occur would <br /> extend beyond the permit area. <br /> Negligence: The ford was used in a single instance to move a piece of construction <br /> equipment across the stream so that a sediment pond could be cleaned out. The <br /> potential damage that could have occurred by ignoring this problem is far greater <br /> than the problem created by a single crossing incident. <br /> Good Faith: These points are assessed due to the company's diligence in constructing <br /> a bridge. The company acted as quickly as work could be done. <br />