Laserfiche WebLink
CHRONOLOGY - 1984 <br /> August 15-16. Inspection. <br /> August 17. Tunnel pond dams completed to grade. <br /> Remaining work still to be done (i.e. rip rap, <br /> catwalks, valve handles installed, etc. ) <br /> August 29. Mid-Continent wrote to MLRD to specify 1984 <br /> planting mixture for 8, 000 ' and 10, 000 ' <br /> elevation. <br /> September 10. MLRD approves as minor revision the modification <br /> of the revegetation seed mixtures. <br /> September 11. MLRD correspondence indicating approval for <br /> minor revision to modify revegetation and <br /> seed mixtures. Note: seed mix updating is <br /> a requirement. <br /> September 12. Tunnel ponds certified complete. <br /> September 14. Purchase Order Request for 1, 000 lb. of seed. <br /> September 21. Purchase Order to Roaring Fork Co-op for 1,000 <br /> lb. seed, cost of $5,416, to be shipped in 1 <br /> week. <br /> October 1-6. Rain at Coal Basin. - <br /> October 10. Seeds shipped to Carbondale Co-op. <br /> October 11. Seeds arrive at Coal Basin. <br /> October 12 - 14. Rain, mixed with snow, at Coal Basin. <br /> October 15 - 24. Continuous snowfall at Coal Basin. <br /> October 27 - 29. Rain and snow at Coal Basin. <br /> October 30 - 31. MLRD inspection. <br /> Total of 32.5" snowfall in Coal Basin during October. <br /> Tunnel sediment pond areas, which are north facing at 8,650 ' <br /> elevation, became inaccessible during this period due to ground <br /> saturation and snowcover conditions. <br /> November Seeding done in south-facing areas. <br /> November 1. Seeding at blending bin, front gate, Savage <br /> yard. <br /> November 3. Seeding at conveyor route, fill slopes, <br /> glory hole face up. <br />