My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (16)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:53:00 PM
Creation date
10/4/2012 11:22:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) CV-89-032
Violation No.
C-89-032
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION DIVISION <br /> STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br /> NOTICE OF VIOLATION NOV No.Permit No. :No. : Mine: (fALcxl 6C-6iPI �e5 <br /> Type of Mine: wr f� County: 6-ftV-: e tlLLrH z-fUtj,50! <br /> Operator (If Other than Permittee) : Permittee: HTd -��r��evllf" GX urCresTviC. <br /> Mail Address: 12)r <br /> Mail Address: CO. F16,;2 3 <br /> Date/Time of Inspection: <br /> Inspector: (,o) l,ctwt Grp 3/G PH /0L311 <br /> Person Served: Served By: <br /> Signature of person served Signature of authorized representative <br /> of Mined Land Reclamation Division) <br /> (Please print name and tit e Date and Time of Service: <br /> A.M. <br /> CERTIFIED MAIL NO. P.M. <br /> Return Receipt Requested <br /> The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br /> the above mine and has made the findings stated in the attached schedule and has <br /> found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br /> of required permit conditions, listed in the attached schedule. This notice <br /> constitutes a separate notice of violation for each violation listed. <br /> You must abate each of these violations within the designated abatement time. <br /> Where the remedial action requires submission of plans, the plans are to be <br /> submitted to the Division within the designated time. You are responsible for <br /> doing all work in a safe manner in compliance with all applicable laws and <br /> regulations. <br /> The undersigned finds that cessation of mining is is not _ expressly, or in <br /> practical effect, required by this notice. For this purpose, "mining" means <br /> extracting coal from the earth or from a waste pile and transporting it within or <br /> from the mine site. <br /> C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br /> $5,000 for each violation and provides that each day of continuing violation may be <br /> deemed a separate violation. <br /> Important: Please read the reverse side of this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.