My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (13)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:48:31 PM
Creation date
10/4/2012 9:32:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) Violation TDN 91-02-355-003
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EHi Or rti <br /> • <br /> United States Department of the Interior <br /> T --_- _ <br /> 0 OFFICE OF SURFACE MINING <br /> RECLAMATION AND ENFORCEMENT L <br /> BROOKS TOWERS <br /> 1020 15TH STREET <br /> DENVER. COLORADO 80202 In Reply Refer To: <br /> November 27, 1991Ln <br /> , C� <br /> S n <br /> MEMORANDUM L` Lj <br /> DEG 1 01991 ; 1 <br /> TO: Steve Rathburn, Chief l <br /> Inspection and Enforcement Branch --------- <br /> ' <br /> THROUGH: Charles Harrison, Chief - > <br /> Engineering Support Section <br /> FROM: Robert Inman, Mining Engineer Y 4� <br /> Engineering Support Section <br /> SUBJECT: Mid Continent Coal Basin Mine <br /> Per your request we have reviewed the Colorado Mined Land Reclamation Department <br /> (MLRD) response to your Ten Day Notice X-91-02-355-003. <br /> The road width reduction as explained in the MLRD ten day notice response indicates <br /> MLRD expects to reduce the backfilling and grading by 64% or to 99000 cubic yards of <br /> backfilling compared to the previously N LRD furnished backfilling amount of 274,429 <br /> cubic yards. Possibly a review of these backfilling calculations and information are in <br /> order. Without additional information the backfilling can not be disputed. <br /> The structure calculations were reviewed and also checked with the R.S. Means <br /> Company Inc., as to the costing and methods used by the MLRD for costing of structure <br /> removal. The method of costing is in line for urban areas of the "Means Site work cost <br /> Data" book. However, the conditions to be experienced at the coal basin property have <br /> not been established as yet. ESS did escalate the MLRD costing to April 1991. Using <br /> the MLRD procedures and escalated to 1991 cost, the previous WSC structure removal <br /> costing has been reduced $242,564 to a total of S1,196,800 from S1,439,364. <br /> Using this information the bond calculation of direct costs is S2,716,288 plus indirect <br /> costing-of S687,221 for a total estimated reclamation bond amount required of <br /> $3,403,509. This reflects the reduction in backfilling and a reduction in the structure <br /> disposal costs. <br /> If you should have any questions regarding this matter, you may contact Robert Inman <br /> at F TS 564-2420 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.