My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (10)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:44:06 PM
Creation date
10/4/2012 8:46:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents ā(IMP)ā Violation CV-90-049
Violation No.
C-90-049
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MLRD Summary of Joint Inspection <br /> Week 2 (July 30-August 2) <br /> Week 3 (August 12-16) <br /> Particioant: present for portions or all of the second and third weeks of the <br /> MLRD/USFS joint inspection included the following: <br /> USES Hid-Continent MLRD <br /> Tony Savatos Diane Delaney Dan Mathews <br /> Jack Walton _eā¢..4 Thompson <br /> Sam Schroeder Bruce Coilins <br /> Mike Mechau <br /> John Stickney <br /> A summary of the first week of the inspection was previously forwarded to the <br /> USES, along with one Notice of Violation (NOV) which was issued to <br /> Mid-Continent as a result of that inspection. Since the conclusion of the <br /> joint inspection, three additional road drainage NOVs and two non-coal waste <br /> related NOVs have been issued by the Division to Mid-Continent. The NCVs <br /> specify certain remedial work wnicn is to be completed this fall , along with a <br /> comprehensive road drainage and road and portal bench <br /> sta0ilizationlreclamaticr, plan revision to be submitted by December 13 , 1991 . <br /> Copies of the NOVs are enclosed. <br /> Problems which are addressed in detail in the NOVs are not repeated in this <br /> inspection summary. This summary primarily addresses the generalized problems <br /> and concerns which were observed and discussed during the inspection, along <br /> with alternative approaches and considerations , and preliminary <br /> recommendations which arose from the inspection. Based on the inspection , <br /> USiS and the Division will deve'c tp ]oin recommendations which will be <br /> forwarded to the operator. <br /> Problems observed to lesser or greater extent on various road segments and <br /> portal bench areas include the following . Also listed for each problem are <br /> primary contributing factors and alternative approaches to the problem. <br /> Problem: Erosion at culvert outlet or ditch relief downdrain <br /> (see NOV C-91-016) contributinc factors : <br /> Contributing Factors : <br /> Imoroper riprap sizing or placement <br /> Excessive flow concentration <br /> improper downdra' n structures <br /> Possible approaches : <br /> Replace riprap per permit specifications <br /> Re-evaluate culvert and ditch relief spacing and provide additional <br /> culverts and/or rolling dips , with proper outlet protection. <br /> Install CMP or other protective downdrains for culverts which <br /> discharge high on fills or steep erosive downslopes such as those <br /> in the immediate vicinity of the portal benches . <br />
The URL can be used to link to this page
Your browser does not support the video tag.