Laserfiche WebLink
7. Install an additional 18" culvert or construct an appropriately sized <br /> rolling dip in the vicinity of Sta. 7+50 to 8+00, Road F, to minimize the <br /> amount of road drainage directed along the toe of the slide debris . A <br /> catchment dike consisting of a straw bale barrier at least 2 bales high <br /> and 2 bales wide , staked firmly in place should be provided below the <br /> base of the road fill along the length of the slide area to prevent <br /> deposition of slide debris into the stream. <br /> 8194F/scg <br /> -2- <br />