My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (18)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:56:13 PM
Creation date
10/4/2012 8:23:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) CV-90-049
Violation No.
C-90-049
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NIid-Continent Resources, lYlc. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> 201 Centennial Street <br /> .1 -CONTINENT RESOURCES, INC. Suite 106 Telephone: <br /> 625 PLAINFIELD ROAD-SUITE 220 <br /> WILLOWBROOK, ILLINOIS 60521 Glenwood Springs, Colorado 81601 (303)945-4958 <br /> October 31 , 1990 <br /> - 3 <br /> Mike Savage <br /> MLRD <br /> Room 215 �C`a` - <br /> 1313 Sherman <br /> Denver, CO 80203 <br /> RE: NoV C-90-049 , C-90-050 , C-90-051 , C-90-052 <br /> Dear Mr. Savage: <br /> During the inspection of October 23 , 1990 the Division issued four <br /> notices of violation, including NoV(s) C-90-049 , C-90-051 and C-90- <br /> 052 , which require abatement by November 23 , 1990 , and C-90-050 , <br /> which requires abatement by December 23 , 1990 . <br /> The abatement steps, including modification of ponds, repair of <br /> road culverts, repair of a ditch, and repair and/or construciton of <br /> sediment control structures, require extensive work which is not <br /> feasible or desirable during the winter months . <br /> As you know, the mine site is at high elevation (8 , 000' to 10 , 0001 ) <br /> and we have already entered the frost and snow season. Completion <br /> of the work required by the NoVs under frost and snow conditions <br /> would be difficult if not impossible, and the disturbance to the <br /> ground would be environmentally harmful. <br /> Accordingly, Mid-Continent requests an extension of the period <br /> allowed for abatement by 90 days in consideration of the the <br /> climatic conditions at the mine site. <br /> The regulations of the Division at §5 . 03 . 2( 2) (b) provide that an <br /> extension of the abatement period originally fixed may be allowed <br /> when due to circumstances which include at §5 . 03 . 2( 2) (c) (iv) : <br /> Whara cZjmatjc conditions pracZuda sbetama n't w3t22j.n 90 <br /> days� or where� du a t o c Z 3 ms t j c c ondi t 3 ons� s,ba t ama n t <br /> w_Lth.in 90 desys cZa,2y wouZc7 causes more anvironmanteZ <br /> h8rm t hen �L t wo u 2 d preve n t <br />
The URL can be used to link to this page
Your browser does not support the video tag.