Laserfiche WebLink
RECEIVE: <br />Boren Environmental Pollution Consultine (BEPC) Aueust 1.20I2, <br />!Undisturbed Soil -1 , • <br />pH ECmmhos cm :OM % ;B(mg/k•) f >2mm Y <br />() <br />TP01 (0-8) 7.10 3.0 i 2.5 I 1.5 1 0.16 <br />TP01 (8.36) 7.30 2.6 i 1.6 I : II I 0.03 <br />TP02 (0-10) 77.4300 3.3 E 2.7 ■ �.' 1,8 032 <br />TP02 0 -34 ;,... ,. <br />C ) �_ 2.4 { <br />TP03 (04) .. - . - . 7.20 _ .._...- _ 23 _. _. . 2.9 I ..:1.6 { . .0.171 <br />l TP03 (7 -24) ._ .. _...7.10 _i 2.1 � 1.4 _ ......,.�_ . -'; _ . ..- � 12 0,0 <br />i ... ....., -- I <br />• <br />TP03 (26 7.30 . ,............_ 0.8 .. „, ...._ 0.6 .._�,. . <br />0.8 <br />TP03 (60 -148) 7.40 0.7 <br />T Poo r0.6) <br />3.4 2.9 _ `...,........__ 1.4 i <br />TPO4 (34 -50) »...... 740 2.0 0.6 1.0 1 __._ 0.06 <br />,. _ T1 5- 15 . 4 -- (56-134) 7.80 -' 0.a _.__ ._..., <br />Average 7.3 2.1 L7 13 0.1 <br />M !w <br />i OU <br />c 50 <br />.40 <br />,• 30 <br />20 <br />v <br />3 10 <br />. 0 <br />•o <br />MAJOR CONCLUSIONS: <br />Topsoil replacement plan <br />roll ce c, c`1 P <br />ti %- �.xo , , � o° .sb 4. <br />, <br />o eeneh 15 u bsoil Subst <br />a Mixed Topsoil <br />aUftA <br />Page 9 of 13 <br />NO.0743 08/10 /2012 /FRI 12:11AM <br />OA1 <br />- 0.05 <br />0.17 <br />0.02 W <br />Additionally, based on the fact that a "Prime - farmland soil" must meet the following <br />criteria "(v) The soils can be managed so that, in all horizons within a depth of 40 inches (1 <br />meter) or in the root zone if the root zone is less than 40 inches deep, during part of each year the <br />conductivity of the saturation extract is less than 4 wmhos /cm (or 4 dSlm)" it is likely that <br />the use of bench 1 substitute soil will prevent the reclaimed soil from meeting these criteria since <br />it will become a part of the first 40 inches of the new topsoil (see the plot of the "topsoil <br />replacement plan" above) and the measured conductivity (EC) for this substitute soil was for the <br />most part higher than 4 (see tabulated values above for the "substitute soil "). <br />The reclaimed (top)soil needs to have same salinity (EC -2), organic matter content <br />(OM% '- 1.7); level/slope as existed pre - mining; rocks need to be removed (to an average <br />percent coarse (rock) fragments >3" less than 0.1; see table below), and soil depths should be <br />similar for each horizon as existed pre - mining (un- disturbed soil). In addition, the reclaimed soil <br />has to be classified to ensure that it meets the Land Capability Class Ile and Prime - farmland soil <br />criteria. <br />