My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (7)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 1:07:41 PM
Creation date
10/4/2012 7:57:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP)CV-90-051
Violation No.
C-90-051
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Continent Resources, Inc. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> MID-CONTINENT RESOURCES,INC. 201 Centennial Street <br /> 625 PLAINFIELD ROAD-SUITE 220 Suite 406 Telephone: <br /> WILLOWBROOK,ILLINOIS 60521 Glenwood Springs, Colorado 81601 (303)945-4958 <br /> 6.j Ste. <br /> January 8, 1991 <br /> JAN , 1 199' <br /> Larry P. Routten <br /> Mined Land Reclamation Division <br /> Room 215 <br /> 1313 Sherman <br /> Denver, CO 80203 <br /> RE: NoV C-90-049, C-90-050, C-90-051, C-90-052 <br /> Dear Mr. Routten: <br /> Mid-Continent Resources requests an extension of the period for <br /> abatement of Notices of Violation C-90-049, C-90-051 and C-90-052, <br /> and C-90-050, which were written at the time of the October 23 , <br /> 1990 inspection. <br /> Mid-Continent requested, and the Division granted, an extension of <br /> the abatement period in consideration of the climatic conditions at <br /> the mine site, which make it infeasible to carry out the necessary <br /> work during the winter months. <br /> NoVs C-90-049, C-90-051 and C-90-052 had originally required <br /> abatement by November 23 , 1990 , and NoV C-90-050 had required <br /> abatement by December 23 , 1990. The Division, on November 21, <br /> 1990, issued an extension of the abatement period until January 21 , <br /> 1991 for all the notices of violation (with the exception that <br /> repair of the East Sutey Pile ditch be completed by November 23, <br /> 1990, as originally required by NoV C-90-051. The work was <br /> completed in the required time period) . <br /> The regulations of the Division provide that an extension of the <br /> abatement period originally fixed may be allowed when due to <br /> circumstances which include, at §5.03 .2(2) (c) (iv) : <br /> Where climatic conditions preclude abatement within 90 <br /> days, or where, due to climatic conditions, abatement <br /> within 90 days clearly would cause more environmental <br /> harm than it would prevent; <br />
The URL can be used to link to this page
Your browser does not support the video tag.