Laserfiche WebLink
Sutey Topsoil Piles <br /> Catchment basins were constructed for sediment control at the two <br /> Sutey topsoil piles as approved by MR-17 in June of 1989 . I've <br /> enclosed a copy of materials submitted with that MR which show the <br /> system. <br /> Some maintenance and repair work was required on the system, which <br /> involved clean-out of the lower part of the catchment basin and <br /> repair of a section of berm. This was completed last fall. <br /> We believe met the requirement for abatement. <br /> Yours truly, <br /> (FIA <br /> Diane Delaney <br /> Mid-Continent Resources <br />