My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-11-28_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1986-11-28_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 9:13:54 AM
Creation date
10/3/2012 10:18:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/28/1986
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• r <br /> Candy Thompson - 4 - March 4, 1986 <br /> V. Total Reclamation Costs <br /> 1 ). Direct Costs <br /> Backfilling and Grading $2$ 15,199.00 <br /> Demolition $605,095.00 <br /> Revegetation $659$ 00.00 <br /> Loadout $342$ 18.00 <br /> Sutey Refuse Area $205,252.00 <br /> Tunnel to Wash Plant Conveyor $307,138.00 <br /> $4$63450FM <br /> 2) Indirect costs <br /> Public Liability Insurance @ 0.8 percent $37,076.00 <br /> Workman's Compensation @ .127 percent $5,886.00 <br /> Contractor's Performance Bond @ 0.7 percent $32,442.00 <br /> Job Superintendent 10,000 hrs @ 20.00/hr $200,000.00 <br /> MLRD Administration @ 5.0 percent $231 ,723.00 <br /> Contractors Profit @ 10 percent $463,450.00 <br /> $970$ 87.00 <br /> 3) Total Reclamation Costs $4,634$ 02.00 <br /> + $970,587.00 <br /> Total Bond $5,600,000.00 <br /> This total cost represents a substantial increase over the current bond, which <br /> I believe is approximately $2.5 million. Mid-Continent should examine these <br /> figures, provide evidence to lower costs where possible, and revise the bond <br /> as necessary. In addition to cost estimates, Mid-Continent should reappraise <br /> the property being used for bond in light of current economic conditions. <br /> srs <br /> 8129F <br />
The URL can be used to link to this page
Your browser does not support the video tag.