Laserfiche WebLink
Candy Thompson - 3 - March 4, 1986 <br /> seeding, raking, and hydromulching could easily approach $2,000/acre. The <br /> cost of planting bare root seedlings would be from .40 - 1 .00/seedling. These <br /> costs are based on MLRD experience, and can be verified using several <br /> references including "Means". <br /> Revegetation Costs <br /> No. Mine and Roads <br /> 34 acres x $2,500/acre = $85,000.00 <br /> No. 2 Mine and Roads <br /> 13 acres x $2,500/acre = $32,500.00 <br /> No. 3 Mine and Roads <br /> 40.1 acres x $2,500/acre = $100,250.00 <br /> No. 4 Mine and Roads <br /> 35.4 acres x $2,500/acre = $88,500.00 <br /> No. 5 Mine and Roads <br /> 44.8 acres x $2,500/acre = $112,000.00 <br /> Tunnel Area <br /> 30.5 acres x $2,500/acre = $76,250.00 <br /> Prep Plant <br /> 40 acres x $2,500/acre = $100,000.00 <br /> Miscellaneous Roads <br /> 26 acres x $2,500/acre = $65,000.00 <br /> IV. Other Areas <br /> Calculations for the loadout area are based on total reclamation. It was felt <br /> that worst cause must be applied, as there is no certainty that a business can <br /> be established on the site. Costs for Sutey and the Tunnel Conveyor were <br /> taken directly from calculations performed last year. <br /> A. Loadout. <br /> Facilities demolition $326,394.50 <br /> Rip Pavement $7,760.00 <br /> Well Sealing $750.00 <br /> Grading $3,404.00 <br /> Revegetation $4,000.00 <br /> B. Sutey Refuse area $205,252.00 <br /> C. Tunnel to Wash Plant Conveyor $307,138.00 <br />