Ms. Candace Thompson <br /> November 26 , 1986 <br /> Page - 4 <br /> 5, 825 ft. x 20 sc�. ft. = 116 , 500 cu. ft. <br /> A B-8 demolition crew can remove 21, 500 cu. ft. per day. <br /> 116, 500 <br /> 21, 500 = 5. 4 days <br /> 5. 4 x $3, 222 per day = $17 ,400 <br /> 17 , 400 <br /> 5, 825 = $3 . 00 per linear foot. <br /> This is the figure we have used throughout in our calculations <br /> for easy access conveyor systems. How did MLRD come up with <br /> $132, 238 for the tunnel to preparation plant, $223 ,446 for <br /> preparation plant area and $230 ,771 for the $utey area? For <br /> example, the conveyor system to the Sutey refuse pile from <br /> the preparation plant is 1950 feet long. <br /> 1950 x 3 = $5, 850 not $230 , 771 <br /> We don' t see any valid reason for recalculating costs of <br /> demolishing conveyor systems . <br /> Backfilling and Grading. <br /> MLRD' s first point with respect to backfilling and <br /> grading is that stringent correction factors should be applied <br /> to dozer production at the mine portals . They have reduced the <br /> rated push production for a D-8 dozer working on the relatively <br /> flat mine benches to only 26% of it' s rated capacity, as follows : <br /> Mine Unadjusted Production Adjusted Production <br /> 1 920 Cy/Hr 221 Cy/Hr <br /> 2 1, 180 if 322 It <br /> 3 680 it185 it <br /> 4 520 171 " <br /> 5 920 195 " <br /> Total 4 , 220 1, 094 " <br /> 1094 <br /> 4220 = . 26 <br />