Laserfiche WebLink
Requirements By Major Activities Cost <br /> Haul Roads $ 106,439 <br /> Rock Tunnel to Prep Plant 54 ,450 <br /> Old Refuse Pile 18 ,700 <br /> New Refuse Pile 33 ,138 <br /> Preparation Plant Area 70 ,400 <br /> Light Use Road 10 ,175 <br /> Sediment Ponds 52 ,250 <br /> Sub Total $ 393, 816 <br /> Coal Loadout Facility <br /> Removing structures $ 32 ,222 <br /> Removing conveyors 5, 750 <br /> Smooth grading & revegetation 3 ,500 <br /> Sub Total $ 41,472 <br /> Direct Costs <br /> Removal of Structures and Sealing Portals $ 468 , 323 <br /> Backfilling and Grading 609 ,520 <br /> Topsoil Replacement 191 ,970 <br /> Revegetation 393 ,816 <br /> Coal Loadout Facility 41 , 472 <br /> Total $1,705 ,101 <br /> Add 10% for administration, etc. Grand Total $1 , 875,611 <br />