Laserfiche WebLink
Requirements By Major Activities Cost <br /> Rock Tunnel to Prep Plant $ 41,632 <br /> New Coal Refuse Area 5 ,192 <br /> Sediment Ponds 17 ,700 <br /> Preparation Plant Area 142 ,129 <br /> Sub Total $ 609,520 <br /> Topsoil Replacement <br /> Mine Portals <br /> No. 1 Mine Bench 16,220 <br /> No. 2 Mine Bench 20,982 <br /> No. 3 Mine Bench 15, 632 <br /> No. 4 Mine Bench 2 ,832 <br /> No. 5 Mine Bench 4 ,720 <br /> Rock Tunnel to Prep Plant 62 ,144 <br /> New Refuse Pile 29,130 <br /> Old Refuse Pile 18 ,766 <br /> Preparation Plant Area 21,544 <br /> Sub Total $ 191,970 <br /> Revegetation <br /> Mine Portal Benches <br /> No. 1 Mine $ 7 ,700 <br /> No. 2 Mine 10,588 <br /> No. 3 Mine 10,175 <br /> No. 4 Mine 3 ,988 <br /> No. 5 Mine 15, 813 <br />