1. Total <br />2. Total <br />3. Total <br />4. Total <br />5. <br />6. Mobilization and Demobilization <br />(I% to 5% of Item 5) <br />7. Contingencies (at <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at <br />(see Graph 2) <br />10. Reclamation Management Fee (at <br />(see Graph 3) <br />11. GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through 10) <br />Engineering News Record Cost Index: Date: <br />-p - '- r1 L 2— <br />1 Ro Al: C osY <br />fro e¢1 <br />/ Ros+o ' <br />• -- a z fqo - <br />"Q °AO D -A <br />Po u A <br />Facility and Structure Removal Costs <br />Earthmoving Costs <br />Revegetation Costs <br />Other Reclamation Activities Costs <br />Subtotal: Total Direct Costs <br />(at <br />% of Item 5) <br />/ /9 -4: <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMAARY SHEET <br />% of Item 5) <br />% of Item 5) <br />% -of Item_5) <br />A - 18 <br />S <br />DRAFT <br />S <br />3 OD <br />-f- �o >j ' / T — /V84 <br />7 Ko /9A ' 73' 4 a g z . <br />f- /ro1w ' P ' 4-3S /./5:,/ <br />% CM $7 ,4 // 214 <br />D _ ¢/3©a <br />