Laserfiche WebLink
1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Porin <br />R.0D - <br />� J <br />2 1 <br />/I W D <br />�z 1� i /zt9a <br />ROAD 'Z' <br />1 , z-t - l z>,-( <br />7 210 gr o• b ' <br />Total Facility and Structure Removal Costs <br />Total Earthmoving Costs <br />Total Revegetation Costs DE; 7 y4-04:4- <br />Total Other Reclamation Activities Costs <br />Subtotal: Total Direct Costs <br />i1. GRAND TOTAL BOND AMOUNT <br />(Sum of Items - through 10) <br />97' - q3 5, got / <br />/k r/4L.5 <br />13v <br />L <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />Mobilization and Demobilization (at % of Item 5) <br />(IS to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph I) <br />% of Item 5) <br />9. Contractor Profit and Overhead (at <br />(see Graph 2) <br />10. Reclamation Management Fee (et % of Item 5) <br />(see Graph 3) <br />-- `T44 //z 4- 9 D -7 / ZO 4 <br />�✓ <br />553,4108 A -18 <br />Project 1 1 — l.. <br />M /g3 <br />Date <br />$ <br />Engineering News Record Cost Index: Date: <br />cj ✓ 4/ to � <br />” 4,13 . ,7 To 5 74 // 2 90 <br />Gorr /r.io4v 7 <br />s Z- <br />/ 7 L / ©NG- <br />$ /q 7 7 <br />g, 5/0 <br />DRAFT <br />9.2`/ ( v' <br />61/42 L c <br />?" .�o z.r47 / ='- <br />rf,f27N ' <br />