Laserfiche WebLink
WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2. Total Eerthmoving Costs <br />3. Total Revegetation' Costs � <br />" --Z 2 2'i 57 20 <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(I% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at <br />(see Graph 3) <br />I1. <br />GRAND TOTAL BOND AMOUNT <br />(Sun of Items 5 through 10) <br />% of Item 5) <br />/ s C 6t D 7• o <br />2 a -,i t /4- <br />¢ 2,96 <br />Tor - ^L' <br />o, f3 C.as-r / 7 s. - 4. <br />A -18 <br />S //54- <br />138 <br />' 4 7 c ' <br />$ <br />Engineering News Record Cost Index: Date: <br />o P 4 '7.7 <br />7(/ <br />PC ,z rAG 6 44 -$z <br />3 1-7: <br />