Laserfiche WebLink
Listing of Buildings to be Demolished: <br />Type of Construc- <br />Item tion Material <br />I) <br />2) <br />3) <br />4) <br />30 1, <br />5) 3 z <br />Other Items to be Demolished: <br />Debris Handling and Disposal Costs: <br />Data Sources: <br />b4 A <br />WORKSHEET NO. 2 <br />STRUCTURE DEMOLITION AND DISPOSAL COST SUMMARY <br />Protect <br />Date <br />Volume Unit Cost Demolition <br />(zablc -#eet) Basis Cost <br />L -F <br />3 c" 3a7.c i 1IS. <br />s 3.0c) / s <br />SS , 7 , e2( <br />Total Cost = $,f : — , 7S <br />.1 <br />° °/ o . / <br />TOTAL DEMOLITION AND DISPOSAL COST = $ 767 <br />