Laserfiche WebLink
Porz.r4i- <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2. Total Earthmoving Costs <br />¢ o <br />3. Total Re vegetation Costs 11® /o�,f� <br />4. Total Other Reclamation Activities Costs ,//L £o/Q QS <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (et % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee. Cat <br />(see Graph 3) <br />GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 10) <br />% of Item 5) <br />% of Item 5) <br />S <br />Engineering News Record Cost Index: Date: <br />Project M C <br />Date V75ik3 <br />DRA g <br />$ 44-9 <br />60/4 -4-6 <br />// 379 4- 840. = (2,2.(9 <br />✓ 55_3066 <br />// Z -.8 <br />