Laserfiche WebLink
p 5 <br />`\ 19Z-t- F FLANT 5 h o,D j WORKSHEET NO. 16 <br />—7" N ` L L Aft e $ RECLAMATION BOND SUMMARY SHEET <br />TG <br />1. Total Facility and Structure Removal Costs <br />2. Total Earthmov i ng Costs L 1 G4-4 T "t"- 01,14 G c <br />3. Total Revegetation Costs <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at 1 of Item 5) <br />(IS to 51 of Item 5) <br />7 Contingencies (at 1 of Item 5) <br />(see Table 4) <br />B. Engineering Redesign Fee (at 1 of Item 5) <br />(see Graph I) <br />9. Contractor Profit and Overhead (at 1 of Item 5) <br />(see Grapn 2) <br />10. Reclamation Management Fee (at 1 of Item 5) <br />(see Graph 3) <br />GRAND TOTAL BOND AMOUNT S <br />(Sum of Items 5 through 10) <br />_n ;sneering News Record Cos' Index: Date: <br />Project <br />Date <br />