Laserfiche WebLink
r <br /> When the rock tunnels are completed the coal will <br /> move out one of the tunnels by belt conveyor and then from <br /> the tunnel portal to the preparation plant by an overland belt <br /> conveyor . The truck haul from mine portal to the plant will have <br /> been eliminated. <br /> The third phase is the handling of the coal as it is <br /> processed through the preparation plant . This procedure is <br /> described in detail in Section II . B . 4 . a(2) . At the completion <br /> of this phase the washed and dried coal is placed in clean coal <br /> storage bins at the preparation plant and the refuse material is <br /> moved by a conveyor belt to the coal refuse disposal area . <br /> The fourth phase consists of loading the clean coal <br /> from the storage bins into over-the-highway covered trucks and <br /> delivering it to the train loadout storage bins . <br /> The fifth phase consists of moving the coal from the <br /> train loadout storage bins by belt conveyors to a train loading <br /> tipple where it is loaded into the individual rail coal cars . <br /> Applicable MSHA and CMLRB regulations are complied with <br /> throughout the coal handling process . Belt conveyors , trucks and <br /> storage bins are covered to minimize dust emissions . <br /> 9 . Coal processing waste and non-coal processing <br /> waste. <br /> a . Introduction <br /> The Coal Basin mining complex will be handling and <br /> disposing of solid and liquid waste in accordance with this plan. <br /> Coal refuse and other solid waste materials will be placed in <br /> designated approved sites . Sediment will be removed from sediment <br /> l0 l <br />