Laserfiche WebLink
LIST OF APPENDICES <br /> Number Subject Location <br /> II-B-1 Methane and Dust Control Plan, No . 1 Mine Separate Tab <br /> 2 Roof Control Plan in Volume 2 <br /> 3 Dust Control Plan <br /> 4 Major Equipment Lists and Operational <br /> Descriptions <br /> 5 Rock Tunnel Project <br /> 6 Surface Buildings and Structures <br /> 7 Hydrologic Control Plan Volume 3 <br /> it <br /> LIST OF FIGURES <br /> Number Subject Page <br /> II-B-1 Preparation Plant Schematic 39 <br /> LIST OF TABLES <br /> Number Subject Page <br /> II-B-1 Tunnel Project Reclamation Schedule 36 <br /> 2 Sediment Ponds 53 <br /> 3 Average Coal Refuse Material Size as <br /> Measured In-Plant 64 <br /> LIST OF EXHIBITS <br /> Number Subject Location <br /> II-A-1 Coal Basin Mine Plan Area In map pockets <br /> 2 B Seam - Sequence of Operations <br /> 3 Middle Seam-Sequence of Operations <br /> II-B-1 Coal Basin Permit Area <br /> 2 a thru e <br /> Surface Facilities and Disturbed Areas <br /> 3 Rock Tunnel Plan and Profile <br /> 4 Rock Tunnel Yard and Refuse Disposal Area <br /> 5 Coal Basin Road System <br /> 6 Conveyor Structure Design <br /> 7 Coal Refuse Disposal Area <br /> 8 Coal Refuse Disposal Area Cross-sections <br />