My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (307)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (307)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:22:47 PM
Creation date
9/25/2012 9:52:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applied over the refuse. The work site is located at elevation <br /> 8, 300 feet. <br /> Special Needs/Considerations: Colorado will provide an on-site <br /> Project Manger and construction specifications for each task. <br /> These tasks are cooperative efforts between the State and the <br /> U.S. Forest Service. <br /> Road work may best be accomplished using tracked excavators, motor <br /> graders, and dozers. Outslope work may be accomplished using large <br /> and small dozers, modified rollers, cranes and other equipment <br /> suitable for work on long, steep slopes. Demolition may require <br /> dozers, pneumatic drills and tracked excavators. Refuse Pile work <br /> may require use of a dozer, scrapers, trucks and shovel. <br /> Is Funding Available For All Materials: Colorado will provide <br /> funding for materials such as fuel and lubricants. Funding for the <br /> provision of construction materials, such as rip rap, will be <br /> provided. Colorado is willing to negotiate a cost to be paid by <br /> the State to the Army for mobilization and demobilization. <br /> Time Frame For Completion: The construction season is limited by <br /> snowmelt and the first heavy snow fall. Mid-July through early <br /> September is the ideal construction time frame. The following <br /> summarizes the anticipated construction times and dates of <br /> completion: <br /> Roads: Mid-July through Late August, 1999. <br /> Outslope Preparation: Mid-July through Mid- to late August, 1998. <br /> Demolition: Mid-June through Late July, 1998. <br /> Refuse Pile: Late July through Late September, 1998 <br /> Project Manager: Steve Renner <br /> Colorado Division Minerals and Geology <br /> 2148 Broadway, #C-5 <br /> Grand Junction, Colorado 81503 <br /> Phone: (970) 241-0336 <br /> Fax: (970) 241-1516 <br /> Project Supervisor: David Bucknam, Administrator <br /> Office of Active and Inactive Mines <br /> Colorado Division Minerals and Geology <br /> 1313 Sherman Street #215 <br /> Denver Colorado, 80203 <br /> Phone: (303) 866-3567 <br /> Fax: (303) 832-8106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.