Laserfiche WebLink
Attachment to Permit Renewal Application Permit# CO-0000396 <br /> Page 9 <br /> building remains.) The foundations of the buildings have also been remcved and <br /> buried, as has the paving in the parking lot. <br /> Control <br /> Reclamation activities are being carried out by the Division of Minerals an:c Gccir y. A. <br /> contractor, hired by Mid-Continent to remove the facilities and equipment as par7 of <br /> salvage and liquidation of mine assets, completed work in 1997. As cf 11998, <br /> acti iry at <br /> the site is being carried cut by the Colorado Division of Minerals and Gec•icey ;DMG;, <br /> and their contractors. <br /> DMG contractors are presently completing DMG projects, wnich include: <br /> The Huntsman Proiect <br /> Approximately 53,000 to 60,000 cu. yds. of coal refuse material is being <br /> transported from the original refuse pile #1 to an area behind the former <br /> site of the former preparation plant. The material has been used in <br /> connection with the backfill-grading work being done in this area. <br /> As indicated, the project is being carried out by a DMG contractor, under <br /> the direction and control of the DMG, funded by a state Grant. as Mid- <br /> Continent's approved reclamation plan did not contemplate or provide for <br /> disturbance of the old refuse pile, or transport of material from this site. <br /> and the sector of refuse pile which is being disturbed in connection with <br /> this project is a pre-law disturbance (i.e., in place prior to and undisturbed <br /> since passage of the Surface Mining Control and Reclamation Act.] <br /> Dutch Creek Diversion <br /> DMG is excavating a new stream channel to convey flows from Dutch <br /> Creek through the yard. The new stream channel will extend will extend <br /> across and will intersect the yard, and will be located primarily on propery <br /> of the U.S. Forest Service. The project is being carried out by DMG <br /> contractors under DMG direction, financed by a federal grant, as Mid- <br /> Continent's approved reclamation plan did not contemplate such a <br /> project. <br /> The new stream channel will intersect the ditch leading to the C01 ponds. <br /> The result is that runoff from the preparation plant area will not flow to the <br /> 001 ponds, whereas runoff from the yard and the refuse pile will continue <br /> to do so. Mid-Continent has requested that DMG provide alternate <br /> sediment control measures for the preparation plant area. <br /> Mid-Continent has requested a declaratory judgmert by the District Court. Pitk;n <br /> Ccunty S,a`e of Colorado, Case No. 97 CV 131-3. as to rights and responsibilities lor <br /> cleanine cf sediment from the OC I ponds <br /> Further activity anticipated for these areas includes transport and placement cf topscll <br />