Laserfiche WebLink
Month <br />Total Surplus <br />Fulton HCU <br />Delivered <br />To Storage <br />[1] <br />Total Free <br />River Water <br />Delivered <br />To Storage <br />[2] <br />Total <br />Deliveries <br />To Storage <br />[3] <br />Storage Release to River or <br />Exchange w/Brighton <br />RMCC's <br />Portion of <br />Storage <br />Evaporation <br />[6] <br />RMCC's <br />EOM <br />Storage <br />[7] <br />Required <br />Release <br />[4] <br />Actual <br />Release <br />[5] <br />Sep <br />0 <br />0 <br />0 <br />33.9 <br />33.9 <br />0 0 0 0 0 0 0 0 0 0 0 <br />3.5 <br />Oct <br />0 <br />0 <br />0 <br />3.5 <br />3.5 <br />0 <br />Nov <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Dec 2012 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Jan 2013 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Feb <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Mar <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Apr <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />May <br />0.9 <br />0 <br />0.9 <br />0 <br />0 <br />0.9 <br />Jun <br />7.9 <br />0 <br />7.9 <br />0 <br />0 <br />8.7 <br />Jul <br />14.2 <br />0 <br />14.2 <br />0 <br />0 <br />22.5 <br />Total <br />135.9 <br />0 <br />135.9 <br />234.3 <br />257.6 <br />25.8 <br />- <br />,011r .. BBA <br />NN ttu',nn ant- /315HC>P )GOIN ASS0C /.1 TT.> /5. <br />Table <br />Ready Mixed Concrete Company - Bromley Site & North Tower Pit <br />Kenneth Mitchell Lake/Erger';e Balance <br />Projections for 2012 -2013 SWSP Amendment <br />(all values in ac <br />[1] Total surplus Fulton HCU delivered to storage is equal to the Fulton Ditch delivery to storage (as reported by RMCC) during times of a <br />downstream river call. <br />[2] Total free river water delivered to storage equals the Fulton Ditch delivery to storage (as reported by RMCC) during free river. <br />[3] Total deliveries to storage equals [1] + [2]. <br />[4] Required releases from storage to the river for augmentation of all pits. Equal to the previous month's remaining operations replacement <br />requirement (Table 1B, Col [22]) plus the required augmentation deliveries to the river (Table 1B, Col [20]). <br />[5] Actual total release of RMCC water from storage to the river or to Brighton in exchange for other augmentation deliveries made by Brighton. <br />[6] RMCC's portion of the Ken Mitchell Lake evaporation, estimated based upon storage projections provided by the City of Brighton. <br />[7] RMCC's storage in Brighton's Kenneth Mitchell Lake 1. Equal to previous [8] + [3] - [5] - [6]. <br />9/5/2012 3 40 PM JAK <br />