C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation for the Phase 5 Berm Raise. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />None <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on August 21, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly repre <br />August 25, 2012. <br />t "'_ - <br />Joseph Hickey, CQA Mon <br />is our findings and observations for the week ending <br />Date: August 26, 2012 <br />Approved By: I/� ' Date: / 56/ -- <br />avnecs <br />P5BR.Weekly Report WE 08.25.2012 <br />