My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-12_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-09-12_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:52 PM
Creation date
9/14/2012 1:03:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/12/2012
Doc Name
CQA REPORTS, 8/25/2012 - 09/01/2012
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D = Day Shift N = Night Shift <br />Project Title: CC &V/ Phase 5 Berm Raise <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 Berm Raise <br />Date: August 25, 2012 <br />Reporting Period: 8/26/2012 through 9/1/2012 <br />Ambient Temperature Range (F): Low: 54 °F ( + / -) High: 79 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: None <br />PHASE 5 BERM RAISE FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Subgrade Preparation <br />A CAT 663 vibratory smooth drum compactor was used to compact subgrade at the Phase 5 <br />Berm Raise. The subgrade surface was moisture conditioned using a tandem axle water truck <br />(when necessary) and compacted with at least 4- passes. Subgrade was inspected and accepted <br />by an AMEC field representative for soil liner fill placement. <br />B) Select Structural Fill Placement <br />No work performed during the week. <br />C) Slope Contouring <br />No work performed during the week. <br />D) Soil Liner Fill (SLF) <br />No work performed during the week. <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />II) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Geomembrane Exposure <br />No work performed during the week. <br />amec <br />Project No.: 74201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />P5BR.Weekly Report WE 08.25.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.