Laserfiche WebLink
Western Gravel E &P Waste Disposal Facility October 2011 <br />CQA/QCP Page 18 of 19 <br />Top of Liner /Anchor Trench Surveying <br />The surveyor will document top of liner and anchor trench locations by survey using established control. <br />Horizontal extent of the edge of liner and anchor trench will be surveyed on a spacing of 50 feet or less. <br />Horizontal measurements shall be read to the nearest 0.1 foot to establish locations at a minimum <br />precision of 0.5 foot. <br />Leak Detection System Surveying <br />The surveyor will document the thickness and extent of the sand (drainage) materials used in th e leak <br />detection system. Vertical elevations of the drainage layer materials will be documented based on a <br />minimum spacing of 50 feet or less. Vertical measurements shall be read to the nearest 0.1 foot to verify <br />minimum depth of sands. Alternatively, the CQA Engineer may elect to verify the minimum thickness of <br />the drainage layer materials using a blunt probe. <br />The horizontal and vertical locations of all permanent piping and manholes for the leak detection system <br />shall be established by surveyor. The top of pipe shall be surveyed on a spacing of 50 feet or less. <br />Elevations shall be measured to the nearest 0.01 foot. Horizontal locations shall be measured to the <br />nearest 0.1 foot. <br />Leachate Collection and Removal System Surveying <br />The surveyor will document the thickness and extent of the leachate gravels (drainage) materials placed at <br />the base of the cells and used in the leachate collection and removal system. Vertical elevations of the <br />drainage layer materials will be documented based on a minimum spacing of 50 feet or less. Vertical <br />measurements shall be read to the nearest 0.1 foot to verify minimum depth of gravels. Alternatively, the <br />CQA Engineer may elect to verify the minimum thickness of the drainage layer materials using a blunt <br />probe. <br />The horizontal and vertical locations of all permanent piping and protective covers for the leachate <br />collection system shall be established by surveyor. The top of pipe shall be surveyed on a spacing of 25 <br />feet or less. Elevations shall be measured to the nearest 0.01 foot. Horizontal locations shall be measured <br />to the nearest 0.1 foot. <br />Surface Water Drainaae Survevin <br />The as -built configuration of all man-made permanent surface water drainage features shall be measured <br />by the surveyor. Contour maps illustrating constructed grades and elevations for each of the drainage <br />structures shall be provided by the surveyor. The flow line of each drainage channel and stormwater <br />impoundment shall be surveyed for horizontal and vertical locations on a spacing of 50 f eet or less. Cross <br />sections of the channels and stormwater impoundments shall be surveyed every 200 feet or less of length <br />to verify construction in accordance with the Design Plans and Drawings and the axes of the tops and toes <br />of slopes will be surveyed on a spacing of 50 feet or less. Vertical measurements shall be read to the <br />nearest 0.01 foot to establish elevations at a minimum precision of 0.1 foot and horizontal measurements <br />shall be read to the nearest 0.1 foot to establish locations at a minimum precision of 0.5 foot. <br />Final Soil Cover/Landfill Cap Surveying <br />The as -built configuration of the components used to construct the final soils cover /landfill cap shall be <br />measured by the surveyor after the construction of each layer (foundation layer, frost protection layer and <br />vegetative layer). Contour maps illustrating constructed grades and elevations for each of the layers shall <br />be provided by the surveyor. Vertical elevations of as -built grades will be documented based on a grid <br />NWCC INC. <br />