Western Gravel E &P Waste Disposal Facility October 2011 <br />CQA/QCP Page 17 of 19 <br />LEACHATE COLLECTION AND RECOVERY SYSTEM PIPING <br />This part of the CQA/QCP describes the piping materials used in the construction of the leachate <br />collection and recovery system. <br />Piping <br />Perforated 12 -inch diameter HDPE collection piping will be placed at the bottom of the sump area. The <br />perforated piping will be surrounded with clean leachate gravels as specified in the Earthen Materials <br />section and shown on the Design and Construction Plans. A minimum of 2 inches of leachate collection <br />gravels will be placed below the pipe and a 4 -inch thick layer of protective soil or a 16 -oz non woven <br />geotextile fabric will be placed under the leachate gravels and over the primary liner. The slotted HDPE <br />piping shall consist of SDR 17 pipe with % inch diameter perforations spaced 60 degrees radially and at 1 <br />foot center. The collection pipe will connect to solid 12 inch diameter HDPE piping that will run up the <br />sidewalls of the cell. The solid HDPE piping will extend beyond the finished soil cover /cap for the cell <br />and be protected by a 24 -inch diameter galvanized CMP with a locking cap. Hydrated bentonite will be <br />used to fill the annulus between the HDPE pipe and CMP. HDPE piping shall comply with ASTM <br />D3035 and D3350. No specific testing of the piping is required; however all piping must be observed and <br />accepted by the CQA Engineer during placement and prior to backfilling. <br />SURVEY CONTROL <br />This part of the CQA/QCP describes the survey control that will be required during the construction of <br />the facilities. All surveying will be performed a Colorado licensed Professional Land surveyor. Surveys <br />performed for inclusion in the CQAC Certification Reports shall include but not be necessarily be limited <br />to: <br />1. As -built subgrade excavation contours and grades. <br />2. As -built anchor trench locations. <br />3. As -built top of primary liner. <br />4. As -built locations of the leak detection trenches, piping and manholes. <br />5. As -built locations of leachate collection system piping and gravels. <br />6. As -built locations, contours and grades of all engineered surface water diversion structures. <br />7. As -built locations, contours of final soil cover /landfill cap materials including contours and extent <br />of GCL <br />Excavation Surveying <br />Grade staking will be performed by surveyor to establish required elevations for the excavation base <br />facilities. Vertical elevations of excavation grades will be documented based on a grid spacing of 50 feet <br />or less, and the axes of the tops and toes of slopes will be surveyed on a spacing of 50 feet or less. <br />Vertical measurements shall be read to the nearest 0.01 foot to establish elevations at a minimum <br />precision of 0.1 foot. Horizontal measurements shall be read to the nearest 0.1 foot to establish locations <br />at a minimum precision of 0.5 foot. As -built measurements of the completed cell subgrade will be taken <br />with the above requirements prior to placement of the secondary liner materials. Contour maps illustrating <br />constructed grades and elevations for each of the cells shall be provided by the surveyor. <br />NWCC INC. <br />