Laserfiche WebLink
Design and Operations Plan <br />Western Gravel E & P Waste Disposal Facility <br />• Waste characterization documentation, acceptance /rejection letters, waste manifests. <br />• Random screening and inspection results. <br />• Monitoring results (e.g. wet/dry wells, terrace face seepage, landfill gas). <br />• Leachate management. <br />• Construction as -built drawings and construction quality assurance (CQA) reports. <br />• Revisions or variations from approved design or operations procedures. <br />• Personnel training records. <br />• CDPHE correspondence including inspections and notice of violations. <br />• In -house and engineer inspection reports. <br />• Closure and post - closure plans. <br />• Closure and post - closure third party cost estimates. <br />• Quarterly HSRF fees. <br />• Annual financial assurance documentation. <br />• Five year third party cost estimate for financial assurance documentation purposes. <br />• Unauthorized entry and/or dumping at the facility. <br />• Corrective action plans and reports. <br />4.7 INSPECTIONS <br />4.7.1 Weekly Inspections <br />Facility maintenance requirements will be determined based upon routin e weekly inspections. All landfill <br />facilities will be inspected focusing upon evidence indicative of component(s) failure (e.g. spills, leakage, <br />liner exposure, embankment erosion). Weekly inspections will include the LDS, LCRS, surface water <br />diversion and storage structures (e.g. retention pond embankment stability, storm water channels, and <br />culverts), erosion, access road condition, fencing, and signage. In addition, landfill equipment shall be <br />inspected for fluid leaks and repaired, as required. <br />In the event that an observed condition is deemed likely to cause a release of waste materials, CDPHE will <br />be notified within 10 days of the condition including proposed corrective actions. Documentation shall be <br />signed by the person conducting the inspection and included in the Operating Record. <br />4.7.2 Annual Inspections <br />October 24, 2011 <br />Page 42 of 51 <br />Comprehensive annual facility inspections shall be conducted by a qualified Colorado registered Professional <br />Engineer. The focus will be upon similar facility components discussed abo ve. Documentation shall be <br />signed by the engineer conducting the inspection and placed in the Operating Record. Identified deficiencies <br />will be reported to the facility supervisor. <br />Quality assurance /control reports or general repair reports shall be dev eloped following deficiency repairs. <br />In the event that an engineered landfill structure(s) requires repair and/or replacement, a qualified engineer <br />must observe the repair or replacement. A QA/QC report will subsequently be prepared and must be <br />certified, stamped, and signed by a Colorado registered Professional Engineer. QA/QC and general repair <br />reports will be placed in the facility Operating Record. QA/QC reports shall be submitted to CDPHE. <br />4.8 CONTINGENCY PLAN <br />The intent of the contingency plan is to provide response guidance in the event of a potential release of <br />landfill wastes (e.g. leachate). Incidents that could result in a potential release(s) include illegal dumping, <br />suspicious materials, and spills; liquid entering a wet/dry well , recent seep development on the north face of <br />NWCC, Inc. <br />