Laserfiche WebLink
Sunnyside Gold Corporation <br /> Table A <br /> Acreage Disturbed and Reclaimed by Site <br /> Added <br /> Acreage Total <br /> Total Acreage Total Under Acreage in <br /> Permit Disturbed Acreage Reclamation Reclamation <br /> Site Area 1998 Disturbed 1998 Phase <br /> American Tunnel 22.05 0 17.06 0.00 6.93 <br /> Terry Tunnel 7.12 0 4.30 0.00 1 .65 <br /> Sunnyside Basin 66.50 0 49.50 0.00 48.76 <br /> Tailings Pond #4 49.90 0 46.48 0.00 25.54 <br /> Tailings Pond #3 9.09 0 7.71 0.00 7.71 <br /> Tailings Pond #1 & #2 65.38 0 56.11 0.00 56.11 <br /> Engineering Office 18.00 0 18.00 0.00 16.30 <br /> Settling Ponds <br /> Mayflower Mill 5.61 0 5.61 0.00 5.61 <br /> Total 243.65 0 204.77 0.00 168.61 <br /> Notes: 1) Tailings Pond #4 includes haul roads and borrow areas <br /> 2) Engineering Office Site includes all areas south of Hwy 110 <br /> Page 2 <br />